With trucks slipping on the 18% grade cement road leading to the plant, Bamberton Cement Works needed to achieve skid resistance and were considering repaving the road. Instead of a full repave, we were able to use a new machine to retexture the surface, bringing back the cofriction values needed. Compared to repaving, this solution was much more cost-effective.